Site SWMS
Workers On Site:
Hazard Identification - High Risk Activity
Please Tick:
You are aware that you are working in a high risk environment
Please Select Potential High Risk Hazards On Your Work Site
List of Other Potential Hazards To Consider
Other Potential hazards to consider but not limited to are:
- High pressure water or gas
- Chemicals
- Vehicles
- Vibration
- Moving Objects
- Site Access
Trip Hazards
Hot or cold objects
Tools
Trenches
UV Radiation
Unstable Surfaces
Person responsible for ensuring compliance with SWMS
Site SWMS
This form MUST be read, completed and agreed to by all workers BEFORE entering the worksite.
Job Site Details
Select your name from the dropdown menu
This SWMS Document has been approved by the management of Teksol Electrical Solutions - 2020
Hazard Identification - High Risk Activity
Please Tick:
You are aware that you are working in a high risk environment
Please Select Potential High Risk Hazards On Your Work Site
Please note that you must use a full facial respirator when cutting cement sheet, tile or laminate melamine board
List of Other Potential Hazards To Consider
Other Potential hazards to consider but not limited to are:
- High pressure water or gas
- Chemicals
- Vehicles
- Vibration
- Moving Objects
- Site Access
- Trip Hazards
- Hot or cold objects
- Tools
- Trenches
- UV Radiation
- Unstable Surfaces
- Silica Dust Particles
Please Tick:
You have read through the list of potential hazards and understand the risks involved on this worksite
Please mention any other hazards that might be on your worksite
Correct Use Of PPE
You must always use the correct work PPE including appropriate clothing, footwear and safety equipment. PPE must be kept in a good clean & serviceable condition at all times.
Please tick required PPE for this worksite:
Safety Instructions
Please read and adhere to the bellow safety instructions
At any time you feel that yourself or others are in danger or harm of potential hazards, please cease work immediately, leave the worksite and contact your manager or senior representative about the issue.
At no time should you or others be in harms way in the work place.
At no time should you ever work on live parts.
All electrical tools should be appropriately insulated.
All leads should be test & tagged every 3 months accordingly.
The above mentioned is YOUR responsibility. Do you agree to all safety instructions?
Control Measures To Reduce Risk
Please open the relevant control measures documentation bellow and read.
Control Measures - Electrical Installation
Control Measures - Repairs & Maintenance
Control Measures - Split System A/C
Control Measures - Working @ Heights
Including EWP & Ladders
You and all staff members on site have read the appropriate control measures for the specific works you are undertaking and agree to the responsibility of following those control measures
Hierarchy Of Control - System to asses and eliminate hazards
-
ELIMINATION – eliminate the hazard entirely.
-
SUBSTITUTION – replacing the material or process with a less hazardous one.
-
ENGINEERING – redesign the equipment or work process to reduce or eliminate the risk.
-
ISOLATION – isolate the hazard from persons by enclosing or guarding.
-
ADMINISTRATION – adjusting the time or conditions of risk exposure, procedures to manage the risk.
-
PERSONAL PROTECTIVE EQUIPMENT – using appropriately designed and properly fitting equipment where other controls are not practicable.
Additional Safety Notes To Report
Plant, Tools & Equipment Used For This Job
Relevant Legislation, Codes of Practice & Compliance Codes
-
Occupational Health and Safety Act 2004
-
Occupational Health and Safety Regulations 2017
-
Communicating occupational health and safety across languages: Compliance code 2008
-
First Aid in the workplace: Compliance Code 2008
-
Hazardous Manual Handling: Compliance Code 2018
-
Hazardous substances: Compliance Code 2018
-
Workplace amenities and work environment: Compliance Code 2008
-
Plant: Compliance Code 2018
COVID-19 Safety Plan
Please ensure you regularly disinfect yourself along with your tools and clothing. Keep yourself 1.5m Distance from other people at all times, including clients. Make sure to remind clients of this need. Use respirator when required and refrain from touching your face or mouth. Limit touching things that you can avoid as apart of the job.
Stage 4 Restrictions
Be sure to ALWAYS be wearing a face mask during work unless you are in the car alone.
Max of 5 people allowed on any work site at any time.
Max of one work site per day.
Report any misconduct to your manager in charge.
Domestic / Residential non essential works are not permitted.
GOVERNMENT REQUIREMENTS
What other trades are on-site on your arrival?
How many people are on-site on your arrival?
PLEASE SIGN IN TO THE QR CODE PROVIDED FOR MAC (THIS IS ONLY FOR MAC)
Please go back to the EP Page to complete this step.

Emergency Response - Dial 000
If work is to be conducted on a construction site (or a site controlled by another Employer / PCBU) follow the site-specific Emergency Management Plan. Ensure:
-
Adequate numbers of first aid trained staff are on site
-
First aiders are trained & competent in managing injuries until emergency services arrive
-
All rescue equipment is in good condition, available for use and in close proximity to the work site.
Ensure workers have access to:
-
First aid kit/supplies
-
First Aid trained personnel familiar with resuscitation and emergency response for electric shock
-
M/SDS
-
Communication devices (check mobile phones will have service in area)
-
Suitable fire protection equipment.
Incident Reporting
All incidents must be reported. Please follow the below link to report and workplace incidents
INCIDENT REPORTS
Principle Contractor On-Site
Person Who's Email Receives This SWMS
Your Name
By ticking the checkbox below I confirm that I have the skills and training, including relevant certification to conduct the task as described. I agree to comply with safety requirements within this SWMS including risk control measures, safe work instructions and PPE described.
Select Up To 3 Photos To Share